Wood River Station » Dynegy Midwest Generations Wood River Station installing a 92 foot long carbon injection silo. This required the use of both a 550-ton and a 130-ton hydraulic crane. Installation was turnkey with all piping and electrical connections.
Dynegy Midwest Generations Wood River Station installing a 92 foot long carbon injection silo. This required the use of both a 550-ton and a 130-ton hydraulic crane. Installation was turnkey with all piping and electrical connections.